Cost Reduction with Optimum Quality to Fit for Function
Cost reduction through
- Productivity Enhancement
- Continuous mixer for sodium silicate and Co2 curing in loop line
- By alternative manufacturing route
- Cold box core shooting (Amine/Carbon dioxide curing)
- DIP coating, Flood/Flow Coating
- FCAW Welding
- Process Optimization
- Reduction of raw material consumption i.e., Sand to Metal Ratio Reduction using external objects to without loosing Mould strength and its properties
- Reducing cost on quality parameters i.e., welding rod consumption